Site Final | 11/6/2017 | 11/6/2017 | 11/6/2017 | P | PASS |
Andy J. Long
|
|
|
Project complete, stabilized and construction materials cleaned.
|
Aging Inspection | 10/2/2017 | 10/2/2017 | 10/2/2017 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 8/1/2017 | 8/1/2017 | 8/2/2017 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 5/30/2017 | 5/30/2017 | 5/30/2017 | | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 3/29/2017 | 3/29/2017 | 3/29/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP. No trackout into alley. No corrections.
|
Aging Inspection | 1/27/2017 | 1/27/2017 | 2/1/2017 | | PASS |
Melissa Jannusch
|
|
|
Snow covered conditions. No corrections.
|
Site Preparation | 7/8/2016 | 7/11/2016 | 7/11/2016 | A | PASS |
Andy J. Long
|
|
|
Bill Phone #: ###-####
Permit sign posted on front of home. Construction access via paved alley. No stockpiling on site but some trench for drain line repair is needed. GC familiar with ESC permit conditions, clean site. Approved
|