Site Preparation | 10/10/2016 | 10/10/2016 | 10/10/2016 | P | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 10/10/2016 | 10/10/2016 | 10/10/2016 | P | PASS |
Mike Jordan
|
|
|
|
BMP Violation | 7/25/2016 | 7/27/2016 | 7/27/2016 | A | PART |
Andy J. Long
|
|
|
sweep up request follow-up
Initial cement dust was swept and cleaned as well sediment. Driveway appears to have just been poured with some more concrete material left in gutter. Need to sweep up again today when the driveway dries.
|
General Inspection | 7/12/2016 | 7/25/2016 | 7/25/2016 | A | FAIL |
Andy J. Long
|
|
|
Verbal CN to RP Bobby to have gutter and sidewalk swept ASAP. Cement dust resdue left in street and gutter. Does not appear any BMPs were used for containing waste concrete/cement materials.
Will check back tomorrow PM for follow up clean up....
|
Site Preparation | 7/19/2016 | 7/19/2016 | 7/19/2016 | P | PART |
Mike Jordan
|
|
|
. Provide concrete washout.
|
Site Preparation | 7/12/2016 | 7/12/2016 | 7/12/2016 | P | PASS |
Andy J. Long
|
|
|
Todd Phone #: ###-####
Approved for construction.
|