Site Final | 5/26/2017 | 5/26/2017 | 5/26/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
Aging Inspection | 5/25/2017 | 5/25/2017 | 5/26/2017 | | PASS |
Melissa Jannusch
|
|
|
Temporary BMPs removed and parking lot swept. okay to final.
|
Aging Inspection | 3/23/2017 | 3/23/2017 | 3/23/2017 | | PASS |
Melissa Jannusch
|
|
|
No ESC issues observed
|
Site Preparation | 7/21/2016 | 7/22/2016 | 7/22/2016 | A | PASS |
Andy J. Long
|
|
|
Bill Phone #: ###-####
Bill Phone #: ###-####
Site is prepared for excavation. Access drive and permeable pavers for parking were installed previously. MS4 inlet on Targee has sediment bag installed. Perimeter silt fence and clearing limit is established. Permit signs posted. Reminder to have trash containment and concrete washout during foundation work.
|