Aging Inspection | 7/2/2018 | 7/2/2018 | 7/2/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 7/2/2018 | 7/2/2018 | 7/2/2018 | P | PASS |
Michael Zawacki
|
|
|
|
Aging Inspection | 5/1/2018 | 5/1/2018 | 5/1/2018 | | FAIL |
Michael Zawacki
|
|
|
Construction complete and all crews left site. Old concrete washout was left on parcel to south. None of the drain inlets have had their witches hats removed.
|
General Inspection | 3/1/2018 | 3/1/2018 | 3/1/2018 | P | PASS |
Andy J. Long
|
|
|
No trackout or discharges. Silverclouds project near completion. Notified RP to request that all temporary BMPs be removed and that stockpile on frontage lot will need to seeded/tacified if it stays onsite.
|
General Inspection | 2/9/2018 | 2/21/2018 | 2/22/2018 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 2/6/2018 | 2/7/2018 | 2/9/2018 | A | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 12/19/2017 | 12/19/2017 | 12/19/2017 | | PASS |
Michael Zawacki
|
|
|
Complex mostly complete. Majority of work remaining is on west side. Landscapers are on site finishing stabalization. They have caused a lot of tracking onto interior drive, dirt not leaving site. Lot along State St still being used as staging and storage.
|
General Inspection | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | PASS |
Michael Zawacki
|
|
|
WIP on sidewalks, concrete washouts in use. Talke to RP, said they will pave soon and Syman is doing inspections, verified completed inspection in SWPPP. Perimeter control intact along canal and no sign of dust.
|
General Inspection | 9/18/2017 | 9/18/2017 | 9/19/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/18/2017 | 7/18/2017 | 7/19/2017 | | PASS |
Andy J. Long
|
|
|
WIP on vertical construction at Silvercloud. No trackout, discharges, or fugitive dust occuring at site. Surrounding DIs have sediment bag protection. Trash is contained around site, no wind blown trash around the perimeter. No corrections requested.
|
General Inspection | 5/18/2017 | 5/18/2017 | 5/18/2017 | A | FAIL |
Andy J. Long
|
|
|
WIP on Silvercloud.
Correction request: - need to install new construction entrance on Bogart and restrict all employee parking to the surrounding streets. site is unpaved and muddy.
INspection also failed due to grading activity at adjacent development by Trilogy at Roe Street Townhomes. Developer to submit SWPPP and get permits.
|
General Inspection | 4/21/2017 | 4/21/2017 | 4/21/2017 | P | PASS |
Melissa Jannusch
|
|
|
Vertical WIP, concrete washout provided. Signs posted for individual buildings. SWPPP inspections are up to date. Corrections: concrete washout needs maintenance. Sweep up minor trackout.
|
General Inspection | 3/23/2017 | 3/23/2017 | 3/23/2017 | A | PASS |
Andy J. Long
|
|
|
WIP on foundations and framing at Silvercloud. Permit sign posted at rock construction entrance. Large lined concrete washout pit provided. No significant trackout. Storm drains have sediment bags installed.
|
General Inspection | 2/23/2017 | 2/23/2017 | 2/23/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP. Some foundations laid. Excavations for foundations in progress. SWPPP up to date. No ESC corrections requested.
|
General Inspection | 12/5/2016 | 12/21/2016 | 12/27/2016 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 12/5/2016 | 12/5/2016 | 12/5/2016 | P | PASS |
Andy J. Long
|
|
|
No activity at site. Sewer and underground utilities have been installed. No significant trackout observed, permit sign and NOI tracking # posted. Approved.
|
General Inspection | 10/19/2016 | 10/19/2016 | 10/19/2016 | P | PASS |
Andy J. Long
|
|
|
check on dewatering plan status
No activity or personnel at site. No trackout, discharges or other issues.
|
Site Preparation | 10/11/2016 | 10/18/2016 | 10/19/2016 | P | CANC |
Andy J. Long
|
|
|
data entry error, not site prep
|
General Inspection | 10/11/2016 | 10/11/2016 | 10/11/2016 | P | CANC |
Andy J. Long
|
|
|
data entry error
|
Site Preparation | 10/10/2016 | 10/11/2016 | 10/11/2016 | P | PASS |
Andy J. Long
|
|
|
would like call ahead; Mike Phone #: ###-####
MS4 protection on Pocono and Bogart installed. City of Boise permit & SWPPP information and site maps located at site entrance on Pocono. Syman Co. to conduct SWPPP inspections. eNOI for CGP is filed, #IDR12AO60. All surrounding storm drain inlets have sediment filters now installed.
Approved for construction next week. 1st phase will be sewer installation. RP to call me next week for dewatering plan implementation inspection. Plan calls for use of detention/infiltration settling ponds and discharge in the Valley Canal (irrigation district). Will check discharge for turbidity and flow rate. Currently bringing in dump trucks of dirt,
|