DOC - Permit Finaled | 3/23/2017 | 3/23/2017 | 3/23/2017 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped and occupied. BLD finaled. No ESC corrections needed.
|
Site Preparation | 8/26/2016 | 8/29/2016 | 8/29/2016 | A | PART |
Evan Jenkins
|
|
|
Gregg Phone #: ###-####
Excavation for foundation already occured prior to Site Prep Inspection. Permit posted in front of lot Verbal warning issued to RP that no earth disturbance to take place prior to site prep inspection
|