Site Final | 4/5/2017 | 4/5/2017 | 4/5/2017 | P | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. Wind blown trash and temporary silt fence have been removed from the perimeter. BLD open but For Sale sign up. Down gradient inlet controls to remain installed for the vacant lot/future construction. No further ESC requests on this permit.
|
General Inspection | 3/30/2017 | 3/30/2017 | 3/30/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/9/2017 | 3/15/2017 | 3/23/2017 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/9/2017 | 3/14/2017 | 3/15/2017 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/8/2017 | 3/8/2017 | 3/9/2017 | | CANC |
Andy J. Long
|
|
|
no trackout or discharges observed on 3/7 ; need to pick up windblown trash and debris on site and slopes below home. Inspection scheduled for next week
|
General Inspection | 11/9/2016 | 11/9/2016 | 11/9/2016 | P | PART |
Andy J. Long
|
|
|
ESC BMPs installed (permit sign, perimeter silt fence, DI protection).
Violation: trash containment is overwhelmed. Boxes, wrappers, and other materials exposed to wind and elements. Windblown litter on hillside below home.
Correction - empty trash ASAP , pick up all litter around site including on slopes below silt fence. Correction requested to Dave w/ Canyon Crest
|
Complaint Inspection | 9/12/2016 | 9/12/2016 | 9/12/2016 | A | PART |
Andy J. Long
|
|
|
New stockpiles placed on site and continued dust issues. Foundation is backfilled, already gave RP permission to move any excess dirt.
Second request to move or flatten stockpile issued.
|
General Inspection | 9/1/2016 | 9/2/2016 | 9/2/2016 | A | PASS |
Andy J. Long
|
|
|
Stockpile has been moved out of windy area as requested. BMPs around site are installed, no other violations. Approved
|
General Inspection | 8/31/2016 | 9/1/2016 | 9/1/2016 | P | PEND |
Andy J. Long
|
|
|
RP called to notify work is in progress on moving stockpile. Inspection scheduled for tomorrow.
|
General Inspection | 8/31/2016 | 8/31/2016 | 8/31/2016 | P | PEND |
Andy J. Long
|
|
|
report of excessive dust coming off large stockpile...
Informed RP of issue. Called with update from field.
Excavator now in process of removing stockpile. Any remaining backfill that is in a windy location may be moved to the adjacent parcel, which is owned by Canyon Crest.
Will verify corrections tomorrow.
|
Site Preparation | 8/3/2016 | 8/4/2016 | 8/3/2016 | A | PASS |
Andy J. Long
|
|
|
Larry Phone #: ###-####
Permit sign posted with contact info, perimter wattles and silt fence installed around site, and downstream DIs have inlet protection. Approved for excavation. Called Larry to notify I did inspection since I was already in Eyrie Canyon.
|