Permit NumberESC16-00966
StatusFinaled
Name EDWARD CONNELL
Site Address 2193 W BENT BOW CT
Project Name 
Customer Number 
ePlanReviewNo
Description
Eyrie Canyon #7 SFH on top of Bent Bow culdesac by Canyon Crest. BMPs include perimeter sediment control (straw wattle listed), concrete washout shall be contained on site or in the designated neighborhood washout. Storm drains have DI bags already installed.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final4/5/20174/5/20174/5/2017PPASS
DetailsAndy J. Long
Home complete and landscaped. Wind blown trash and temporary silt fence have been removed from the perimeter. BLD open but For Sale sign up. Down gradient inlet controls to remain installed for the vacant lot/future construction. No further ESC requests on this permit.
General Inspection3/30/20173/30/20173/30/2017 CANC
DetailsAndy J. Long
General Inspection3/9/20173/15/20173/23/2017ACANC
DetailsAndy J. Long
General Inspection3/9/20173/14/20173/15/2017PCANC
DetailsAndy J. Long
General Inspection3/8/20173/8/20173/9/2017 CANC
DetailsAndy J. Long
no trackout or discharges observed on 3/7 ; need to pick up windblown trash and debris on site and slopes below home. Inspection scheduled for next week
General Inspection11/9/201611/9/201611/9/2016PPART
DetailsAndy J. Long
ESC BMPs installed (permit sign, perimeter silt fence, DI protection).

Violation:
trash containment is overwhelmed. Boxes, wrappers, and other materials exposed to wind and elements. Windblown litter on hillside below home.

Correction - empty trash ASAP , pick up all litter around site including on slopes below silt fence. Correction requested to Dave w/ Canyon Crest
Complaint Inspection9/12/20169/12/20169/12/2016APART
DetailsAndy J. Long
New stockpiles placed on site and continued dust issues. Foundation is backfilled, already gave RP permission to move any excess dirt.

Second request to move or flatten stockpile issued.
General Inspection9/1/20169/2/20169/2/2016APASS
DetailsAndy J. Long
Stockpile has been moved out of windy area as requested. BMPs around site are installed, no other violations. Approved
General Inspection8/31/20169/1/20169/1/2016PPEND
DetailsAndy J. Long
RP called to notify work is in progress on moving stockpile. Inspection scheduled for tomorrow.
General Inspection8/31/20168/31/20168/31/2016PPEND
DetailsAndy J. Long
report of excessive dust coming off large stockpile...

Informed RP of issue. Called with update from field.

Excavator now in process of removing stockpile. Any remaining backfill that is in a windy location may be moved to the adjacent parcel, which is owned by Canyon Crest.

Will verify corrections tomorrow.
Site Preparation8/3/20168/4/20168/3/2016APASS
DetailsAndy J. Long
Larry Phone #: ###-####

Permit sign posted with contact info, perimter wattles and silt fence installed around site, and downstream DIs have inlet protection. Approved for excavation. Called Larry to notify I did inspection since I was already in Eyrie Canyon.