Site Final | 7/6/2017 | 7/6/2017 | 7/6/2017 | P | PASS |
Andy J. Long
|
|
|
Pool area is complete but not yet filled with water. WIP on patio, yard has hillside vegetation surrounding home and on slopes, but no final landscaping. No further ESC inspections on this permit, ESC conditions for house will be conducted under main site permit ESC13-00806
|
General Inspection | 6/27/2017 | 6/27/2017 | 6/27/2017 | | PASS |
Melissa Jannusch
|
|
|
Pool is staked out. No new earth work yet. No corrections.
|
General Inspection | 6/12/2017 | 6/12/2017 | 6/12/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 5/26/2017 | 5/26/2017 | 5/26/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 5/11/2017 | 5/11/2017 | 5/11/2017 | | CANC |
Melissa Jannusch
|
|
|
|
General Inspection | 4/26/2017 | 4/26/2017 | 4/28/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 4/11/2017 | 4/11/2017 | 4/11/2017 | | PASS |
Melissa Jannusch
|
|
|
No changes in project. Soil in front of lot still not stabilized.
|
General Inspection | 3/23/2017 | 3/23/2017 | 3/23/2017 | | PASS |
Melissa Jannusch
|
|
|
Work on pool has not started. No ESC issues
|
General Inspection | 3/8/2017 | 3/8/2017 | 3/8/2017 | A | PASS |
Melissa Jannusch
|
|
|
No ESC issues observed
|
General Inspection | 3/8/2017 | 3/8/2017 | 3/8/2017 | | PASS |
Melissa Jannusch
|
|
|
No ESC issues observed
|
Site Preparation | 8/4/2016 | 8/4/2016 | 8/4/2016 | P | PASS |
Andy J. Long
|
|
|
Installation of pool at active hillside SFH. BMPs already installed. Reviewed washout and trackout rules to contractor. Approved for construction.
|