Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberESC16-00975
StatusFinaled
Name PAUL MONTALBANO
Site Address 526 E ORION CT
Project NameThe Kennedy Project
Customer Number 
ePlanReviewNo
Description
ESC plan for SFH to be utilized.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final7/6/20177/6/20177/6/2017PPASS
DetailsAndy J. Long
Pool area is complete but not yet filled with water. WIP on patio, yard has hillside vegetation surrounding home and on slopes, but no final landscaping. No further ESC inspections on this permit, ESC conditions for house will be conducted under main site permit ESC13-00806
General Inspection6/27/20176/27/20176/27/2017 PASS
DetailsMelissa Jannusch
Pool is staked out. No new earth work yet. No corrections.
General Inspection6/12/20176/12/20176/12/2017 CANC
DetailsMelissa Jannusch
General Inspection5/26/20175/26/20175/26/2017 CANC
DetailsMelissa Jannusch
General Inspection5/11/20175/11/20175/11/2017 CANC
DetailsMelissa Jannusch
General Inspection4/26/20174/26/20174/28/2017 CANC
DetailsAndy J. Long
General Inspection4/11/20174/11/20174/11/2017 PASS
DetailsMelissa Jannusch
No changes in project. Soil in front of lot still not stabilized.
General Inspection3/23/20173/23/20173/23/2017 PASS
DetailsMelissa Jannusch
Work on pool has not started. No ESC issues
General Inspection3/8/20173/8/20173/8/2017APASS
DetailsMelissa Jannusch
No ESC issues observed
General Inspection3/8/20173/8/20173/8/2017 PASS
DetailsMelissa Jannusch
No ESC issues observed
Site Preparation8/4/20168/4/20168/4/2016PPASS
DetailsAndy J. Long
Installation of pool at active hillside SFH. BMPs already installed. Reviewed washout and trackout rules to contractor. Approved for construction.