Aging Inspection | 10/24/2017 | 10/24/2017 | 10/27/2017 | | PASS |
Andy J. Long
|
|
|
Construction complete, yard landscaped, surrounding sidewalk, gutter and alley free of loose dirt & debris. ESC permit finaled.
|
DOC - Permit Finaled | 10/27/2017 | 10/27/2017 | 10/27/2017 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 8/22/2017 | 8/22/2017 | 8/22/2017 | | PASS |
Andy J. Long
|
|
|
Final re-vegetation and stabilization is in progress. BLD still open. No violations observed.
|
Aging Inspection | 6/22/2017 | 6/22/2017 | 6/23/2017 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 4/20/2017 | 4/20/2017 | 4/20/2017 | | PASS |
Melissa Jannusch
|
|
|
Signs are posted. WIP on interior and exterior. No dirt entering roadway.
|
Random Inspection | 9/21/2016 | 9/21/2016 | 9/21/2016 | A | PASS |
Andy J. Long
|
|
|
WIP on frame. Permit sign posted. No trackout, discharges or uncontained trash . Site is in compliance.
|
Site Preparation | 8/18/2016 | 8/19/2016 | 8/19/2016 | A | PASS |
Evan Jenkins
|
|
|
Don Phone #: ###-####-please call 20 minutes prior to meet
Approved for construction
|