Permit NumberESC16-00982
StatusFinaled
Name MIKE BASABE
Site Address 901 W GOWEN ROAD
Project NameIron Horse Excavation Shop
Customer Number 
ePlanReviewNo
Description
Excavation shop and yard excavation at Gowen Road and S. Broadway. BMPs include establishing vegetative buffer around cleared area, install fiber wattles to protect new storm water swales once installed. Fugitive dust control shall be required. Site located in industrial area. Landscape berm to be installed along frontage.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection8/31/20178/31/20178/31/2017PPASS
DetailsAndy J. Long
project now covered under ESC16-01292. No violations. Permit finaled.
DOC - Permit Finaled8/31/20178/31/20178/31/2017PPASS
DetailsAndy J. Long
General Inspection7/12/20177/12/20177/12/2017PPASS
DetailsMelissa Jannusch
WIP on excavation. SCE is maintained. No trackout. Evidnece of recent water truck activity. No dust observed during inspection. No corrections issued.
General Inspection6/29/20176/29/20176/30/2017PPASS
DetailsMelissa Jannusch
WIP on excavation and grading. No fugitive dust observed but water truck should be used if dust becomes an issue. No corrections issued.
BMP Violation5/15/20175/18/20175/19/2017PPASS
DetailsMelissa Jannusch
SIgn is posted and some rock has been added to entrance. No WIP
General Inspection5/15/20175/15/20175/15/2017PFAIL
DetailsMelissa Jannusch
No permit or SWPPP sign posted. Construction entrance needs maintenance. Called RP and left a message requesting that SWPPP sign with City of Boise permit sign be posted and construction entrance be maintained by Thursday. Need to protect culverts in drainage channel and preform dust control as needed.
Aging Inspection5/12/20175/12/20175/12/2017 CANC
DetailsMelissa Jannusch
General Inspection3/10/20173/13/20173/13/2017PPASS
DetailsAndy J. Long
No new activity or construction at site. No trackout, permit sign posted next to rock construction entrance.

Whe construction resumes, need to request sediment controls to protect culvert pipe under S. Broadway along west side of site.
General Inspection3/8/20173/8/20173/10/2017 CANC
DetailsAndy J. Long
General Inspection11/25/201611/25/201611/25/2016APART
DetailsAndy J. Long
Site rough grading has been completed, project inactive. No ground cover or stabilization but periodic dust suppression watering has occured. No wind blown or fugitve dust issues observed or reported. Permit sign and construction entrance installed. No trackout or uncontained waste materials.

Correction request -
- install check dams on the onsite shoulder borrow ditch to prevent culvert pipe from clogging
BMP Violation9/8/20169/9/20169/9/2016PPASS
DetailsAndy J. Long
1 PM compliance inspection. Complaint of no sign or BMPs received on 9/8.

Permit sign is now posted and construction entrance is installed as requested. Site meeting to be conducted next week with RP MIke to discuss dust control. No dust blowing during light wind at time of inspection.

Possible solutions are :
- Install windscreen/privacy fence
- flatten tops of the stockpiles onsite
- daily application of water via water

There is a culvert that drains the roadside ditch. Will request some check dams leading up to culvert to prevent it from being clogged

note: EPA tracking # IDR12AJ48
BMP Violation9/8/20169/9/20169/9/2016PCANC
DetailsAndy J. Long
1 PM
General Inspection8/26/20168/26/20168/26/2016PPART
DetailsAndy J. Long
Reviewed ESC permit conditions and posting requirements. In particular the requirement to make a practicable effort at fugitive dust control during active construction. It is evident a water truck has been on site.

Mike will post permit information this weekend and wil ensure water truck is available for work. He notified me this will be a slow moving project at the beginning.
General Inspection8/22/20168/22/20168/22/2016PFAIL
DetailsAndy J. Long
Need to post ESC permit sign. No site prep inspection requested as required.

No activity at site, but report of grading conducted without dust control
General Inspection8/12/20168/12/20168/12/2016PCANC
DetailsEvan Jenkins