Site Final | 6/13/2017 | 6/20/2017 | 6/20/2017 | A | PASS |
Andy J. Long
|
|
|
Work complet on apartment building in Aberdeen #5. Common areas landscaped, some units occupied. WIP on carports, all 4 building permits closed. See ESC16-00324 (GRD permit) and ESC17-00380 (carports) for remaining details. No discharges, trackout, dust issues, or construction trash violations observed.
|
General Inspection | 6/13/2017 | 6/13/2017 | 6/13/2017 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 4/27/2017 | 4/27/2017 | 4/28/2017 | | PASS |
Andy J. Long
|
|
|
WIP on interior and landscaping/site improvements within central parking area at Aberdeen #5. All frames for buildings complete. Frontage along Allumbaugh is landscaped. No violations observed
|
General Inspection | 3/9/2017 | 3/9/2017 | 3/9/2017 | | PASS |
Andy J. Long
|
|
|
WIP on Aberdeen apartment phase. 4 buildings with ESC permits and one site development permit ESC16-00324,
No stormwater discharges from site, no trackout. Trash contained in bins. Private onsite stormwater system installed - inlets need sediment protection.
Will check for sweeping and site housekeeping next inspection, no significant issues at this time
|