Site Final | 12/14/2016 | 12/15/2016 | 12/14/2016 | A | PASS |
Andy J. Long
|
|
|
The substation is locked but the project is complete. If you need entry please call me 30 minutes prior to the inspection. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
RP verified project complete. ESC conditions satisfied. Permit finaled
|
Site Preparation | 8/15/2016 | 8/15/2016 | 8/15/2016 | P | PASS |
Evan Jenkins
|
|
|
You will not be able to get into the substation without an escort. If you need to get in we will need to make arrangements. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
--Permit posted on Substation. Approved for construction
|