Site Final | 5/19/2017 | 5/19/2017 | 5/19/2017 | A | DONE |
Mike Jordan
|
|
|
|
DOC - Permit Finaled | 5/19/2017 | 5/19/2017 | 5/19/2017 | P | PASS |
Mike Jordan
|
|
|
|
Tracking Control | 5/3/2017 | 5/3/2017 | 5/3/2017 | A | FAIL |
Andy J. Long
|
|
|
Landscaping crew tracked out dirt from home to vacant lot with grass and grubbed material. No sweep up performed. Subdivision currently on 1-2 week sweeping schedule. Notified RP.
|
Site Preparation | 12/19/2016 | 12/19/2016 | 12/19/2016 | P | PASS |
Andy J. Long
|
|
|
Brett Phone #: ###-####
|