Site Final | 11/21/2016 | 11/21/2016 | 11/21/2016 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 11/21/2016 | 11/21/2016 | 11/21/2016 | P | PASS |
Jim Sly
|
|
|
|
Site Preparation | 8/30/2016 | 8/30/2016 | 8/30/2016 | P | PASS |
Evan Jenkins
|
|
|
Brett Phone #: ###-####
Permit Posted in front of flat lot Approved for construction
|