Site Final | 4/28/2017 | 4/28/2017 | 4/28/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
Aging Inspection | 4/28/2017 | 4/28/2017 | 4/28/2017 | | PASS |
Melissa Jannusch
|
|
|
Project complete. Landscaping complet. Okay to final.
|
General Inspection | 10/14/2016 | 10/14/2016 | 10/14/2016 | P | PASS |
Daryl DeGrange
|
|
|
Permit sign posted, no sediment leaving site.
|
General Inspection | 9/2/2016 | 9/7/2016 | 9/8/2016 | P | PASS |
Andy J. Long
|
|
|
Foundation work in progress. No sediment or stockpiling on sidewalk. Back alley perimeter has Gator Guard wattle installed and inlet protection on the nearby storm drain.
|
Site Preparation | 8/29/2016 | 8/29/2016 | 8/29/2016 | P | PASS |
Evan Jenkins
|
|
|
Permit Posted Approved for construction on flat lot
|