Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberESC16-01088
StatusFinaled
Name RICHARD TALBOY
Site Address 12463 W FAIRVIEW AVE
Project NameMaverick Car Company
Customer Number 
ePlanReviewNo
Description
Flat project with grading for parking lot and new building. Only one ESC permit required for project. ESC plan submitted and shall be implemented at site. Main BMPs will be dust control during grading, trackout controls through duration of the project, and keeping a cleaning staging area with designated & leak proof concrete washout containment. ESC preparation inspection required.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final7/26/20177/26/20177/26/2017APASS
DetailsAndy J. Long
Stockpile at rear of lot has been covered by visqueen weighed with tires to prevent dust and exposure to rain as requested. Parcel owner making decision on what he will do with dirt, contractor said it will either be leveled out or hauled away.

Occupant working on sweeping car sales lot before moving cars in. No trackout or ESC issues next to Fairview, frontage landscaped next to barrow ditch.

ESC permit conditions satisfied, no other corrections.
Site Final7/24/20177/24/20177/24/2017PCANC
DetailsAndy J. Long
Site Final7/21/20177/24/20177/24/2017ANR
DetailsAndy J. Long
Need parking lot swee and stabilization or removal of large stockpile at south end of lot.

Left VM with Dante
Site Final7/21/20177/21/20177/24/2017PCANC
DetailsAndy J. Long
For GRD16-00067 final - Dante Phone #: ###-####
General Inspection6/12/20176/12/20176/12/2017APASS
DetailsAndy J. Long
WIP on preparing parking lot for paving. No significant trackout, stormwater retained onsite. Approved.
General Inspection5/17/20175/17/20175/17/2017 CANC
DetailsAndy J. Long
General Inspection3/29/20173/29/20173/31/2017 PASS
DetailsAndy J. Long
WIP. Frame of building is up. Roadbase/compacted gravel roamix being used for stabilized access and parkig areas. NO trackout observed. No windblown trash, discharges or other violations. No corrections.
Random Inspection11/29/201611/29/201611/29/2016PPASS
DetailsAndy J. Long
WIP. Foundation complete,buildig frame ereccted. No trackout, discharges or dust issues.
General Inspection9/20/201610/5/201610/7/2016ACANC
DetailsAndy J. Long
Site Preparation9/20/20169/20/20169/20/2016PPASS
DetailsAndy J. Long
Dante Phone #: ###-####

Construction entrance installed, wind screen fence installed along Fairview frontage. Water truck is onsite for periodic waterings. Permit sign is filled out with SWPPP info & contacts and shall be posted at entrance.

Approved for construction. Note: no MS4 inlet bags installed for this project