Site Final | 7/26/2017 | 7/26/2017 | 7/26/2017 | A | PASS |
Andy J. Long
|
|
|
Stockpile at rear of lot has been covered by visqueen weighed with tires to prevent dust and exposure to rain as requested. Parcel owner making decision on what he will do with dirt, contractor said it will either be leveled out or hauled away.
Occupant working on sweeping car sales lot before moving cars in. No trackout or ESC issues next to Fairview, frontage landscaped next to barrow ditch.
ESC permit conditions satisfied, no other corrections.
|
Site Final | 7/24/2017 | 7/24/2017 | 7/24/2017 | P | CANC |
Andy J. Long
|
|
|
|
Site Final | 7/21/2017 | 7/24/2017 | 7/24/2017 | A | NR |
Andy J. Long
|
|
|
Need parking lot swee and stabilization or removal of large stockpile at south end of lot.
Left VM with Dante
|
Site Final | 7/21/2017 | 7/21/2017 | 7/24/2017 | P | CANC |
Andy J. Long
|
|
|
For GRD16-00067 final - Dante Phone #: ###-####
|
General Inspection | 6/12/2017 | 6/12/2017 | 6/12/2017 | A | PASS |
Andy J. Long
|
|
|
WIP on preparing parking lot for paving. No significant trackout, stormwater retained onsite. Approved.
|
General Inspection | 5/17/2017 | 5/17/2017 | 5/17/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/29/2017 | 3/29/2017 | 3/31/2017 | | PASS |
Andy J. Long
|
|
|
WIP. Frame of building is up. Roadbase/compacted gravel roamix being used for stabilized access and parkig areas. NO trackout observed. No windblown trash, discharges or other violations. No corrections.
|
Random Inspection | 11/29/2016 | 11/29/2016 | 11/29/2016 | P | PASS |
Andy J. Long
|
|
|
WIP. Foundation complete,buildig frame ereccted. No trackout, discharges or dust issues.
|
General Inspection | 9/20/2016 | 10/5/2016 | 10/7/2016 | A | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 9/20/2016 | 9/20/2016 | 9/20/2016 | P | PASS |
Andy J. Long
|
|
|
Dante Phone #: ###-####
Construction entrance installed, wind screen fence installed along Fairview frontage. Water truck is onsite for periodic waterings. Permit sign is filled out with SWPPP info & contacts and shall be posted at entrance.
Approved for construction. Note: no MS4 inlet bags installed for this project
|