Site Final | 6/22/2017 | 6/23/2017 | 6/23/2017 | A | PASS |
Andy J. Long
|
|
|
|
General Inspection | 6/22/2017 | 6/22/2017 | 6/22/2017 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
General Inspection | 6/7/2017 | 6/7/2017 | 6/7/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 5/18/2017 | 5/18/2017 | 5/18/2017 | | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 5/3/2017 | 5/3/2017 | 5/3/2017 | | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 4/18/2017 | 4/18/2017 | 4/18/2017 | | PASS |
Melissa Jannusch
|
|
|
WIP. Sign is posted. DIs are ok. trash contained.
|
Site Preparation | 9/28/2016 | 9/29/2016 | 9/29/2016 | A | PASS |
Andy J. Long
|
|
|
Clint Phone #: ###-####
BMPs installed. Approved for construction
|