Aging Inspection | 10/12/2017 | 10/12/2017 | 10/12/2017 | | PASS |
Andy J. Long
|
|
|
|
DOC - Permit Finaled | 10/12/2017 | 10/12/2017 | 10/12/2017 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 8/10/2017 | 8/10/2017 | 8/14/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/8/2017 | 6/8/2017 | 6/8/2017 | P | PASS |
Melissa Jannusch
|
|
|
Verticle WIP. Trash contained. No trackout. No corrections issued.
|
General Inspection | 3/17/2017 | 3/17/2017 | 3/17/2017 | P | PASS |
Melissa Jannusch
|
|
|
No ESC issues noted. Landscaping not complete.
|
Site Preparation | 10/10/2016 | 10/10/2016 | 10/10/2016 | P | PASS |
Andy J. Long
|
|
|
Joey Phone #: ###-####
Permit sign(s) posted. Active projects are clean with trash contained. Area storm drains have sediment filter bags installed. Lined designated concrete washout provided and south end of Trailwood. Approved for construction.
|