Site Final | 12/1/2016 | 12/1/2016 | 12/1/2016 | P | PASS |
Andy J. Long
|
|
|
Demolition complete. Site now active for new subdivsion development, Odom Estates. See ESC16-01582
|
General Inspection | 9/19/2016 | 9/19/2016 | 9/19/2016 | P | PASS |
Andy J. Long
|
|
|
Structure has been demolish. Hole not yet filled in and BLD still open. No sediment leaving site, no runoff potential. ESC permit sign posted on power line pole.
|
Random Inspection | 8/25/2016 | 8/25/2016 | 8/25/2016 | P | PART |
Evan Jenkins
|
|
|
Check to ensure contractor is using the water truck onsite to minimize dust from SFH Demo
Very minor dust from demo and loading materials into dump truck. Water truck in use
|
Complaint Inspection | 8/23/2016 | 8/23/2016 | 8/23/2016 | P | PART |
Evan Jenkins
|
|
|
Demo Dust Complaint
During inspection, minimal dust observed. Their is a water truck onsite, and discussed with RP to keep watering down site to reduce any dust, especially during loading into semi
|