Site Final | 4/28/2017 | 4/28/2017 | 4/28/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
General Inspection | 4/27/2017 | 4/27/2017 | 4/28/2017 | | PASS |
Melissa Jannusch
|
|
|
Landscaping complete. okay to final.
|
General Inspection | 4/10/2017 | 4/11/2017 | 4/11/2017 | A | PASS |
Melissa Jannusch
|
|
|
Ok to final with BLD permit
|
General Inspection | 11/8/2016 | 11/18/2016 | 11/18/2016 | P | PASS |
Andy J. Long
|
|
|
No significant changes since prior inspection. No corrections requested at this time. No new erosion rills or sediment runoff issues found or reported. WIP by landscape crew at Harris North entrance.
|
Site Preparation | 11/7/2016 | 11/8/2016 | 11/8/2016 | A | PASS |
Andy J. Long
|
|
|
Austin Phone #: ###-####
First 3 units in Harris North, all 3 parcels adjacent. Portable concrete washout facility with regular servicing to be staged on open lot on Hoot Owl street with stabilized access. Subdivision inlets have sediment filter bags, lots pregraded to drain away from hillside back towards street; earthen berm along hillside edge. Permit signs posted for the 3 projects. Approved.
|