Site Final | 4/12/2017 | 4/12/2017 | 4/12/2017 | A | PASS |
Andy J. Long
|
|
|
Home lanscaped and BLD finaled. Temp BMPs in subdivsion to remain during active constructino on adjacent lots. No corrections. Permit finaled.
|
General Inspection | 10/31/2016 | 11/2/2016 | 11/3/2016 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 10/21/2016 | 10/28/2016 | 10/31/2016 | P | CANC |
Andy J. Long
|
|
|
rescheduled
|
Site Preparation | 10/25/2016 | 10/25/2016 | 10/25/2016 | P | PASS |
Mike Jordan
|
|
|
|
Site Preparation | 10/20/2016 | 10/21/2016 | 10/21/2016 | A | PART |
Andy J. Long
|
|
|
Brett Phone #: ###-####
Permit sign posted, lined washout facility provided for Peppermill SFHs (all by CBH). Storm drains have sediment protection. Approved for construction.
Verbal Correction Request to Brett with CBH: - have crew walk length of 8 mile creek/ditch path and pick up windblown construction and employee trash that has accumulated along the silt fence and bank vegetation. He agreed and will have crew pick up trash next week. Will check next Friday. Brett said it shall be done.
|