Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberESC16-01233
StatusFinaled
Name TRAVIS CONGER
Site Address 4172 W QUAIL RIDGE DR
Project NameQuail Ridge Booster Station
Customer Number 
ePlanReviewNo
Description
See BLD permit for project scope. Work area within subdivision ROW and green space in foothills hollow. ESC & SWPPP controls required at designated staging and material storage area, stabilized construction entrance, and a perimeter sediment control (silt fence or wattle) below site in hollow to treat any storm water sheet flow from the area. Significant vegetative buffer around project.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final11/8/201711/15/201711/15/2017PPASS
DetailsAndy J. Long
General Inspection11/8/201711/8/201711/8/2017 CANC
DetailsAndy J. Long
General Inspection10/24/201710/24/201710/24/2017 CANC
DetailsAndy J. Long
General Inspection10/9/201710/9/201710/11/2017 CANC
DetailsAndy J. Long
General Inspection9/22/20179/22/20179/22/2017 CANC
DetailsAndy J. Long
General Inspection9/7/20179/7/20179/8/2017 CANC
DetailsAndy J. Long
General Inspection8/23/20178/23/20178/24/2017 CANC
DetailsAndy J. Long
General Inspection8/8/20178/8/20178/8/2017 CANC
DetailsAndy J. Long
Conference7/21/20177/24/20177/28/2017APEND
DetailsAndy J. Long
Notify contractor about DI bag removal for site final
Site Final7/20/20177/20/20177/21/2017PNR
DetailsAndy J. Long
Work complete and disturbed has had sod installed for stabilization.

Need to remove DI protection installed 100 meters down access road.
General Inspection7/13/20177/13/20177/13/2017 CANC
DetailsAndy J. Long
General Inspection6/23/20176/28/20176/30/2017APASS
DetailsAndy J. Long
WIP. No trackout or discharges. Check for DI bags installed down access road after completion.
General Inspection6/23/20176/23/20176/23/2017 CANC
DetailsAndy J. Long
General Inspection6/8/20176/8/20176/8/2017PPASS
DetailsMelissa Jannusch
No ESC issues observed.
General Inspection5/23/20175/23/20175/24/2017 CANC
DetailsAndy J. Long
General Inspection4/27/20174/27/20174/28/2017 CANC
DetailsAndy J. Long
BMP Violation4/5/20174/11/20174/11/2017APASS
DetailsAndy J. Long
New storm drain inlet protection provided approximately 60 M downhill from site on access road. Wattles laid across as well for additional protection but need to be weighed down. No new protection of the former tank area. Will check this area for stabilization next inspection.
General Inspection4/5/20174/5/20174/5/2017PFAIL
DetailsAndy J. Long
No sediment protection or initiation of stabilization on disturbed area where water tank used to be located.

Correction -
- install wattles along edge of pavement.
- grade back loose stockpiles and provide stabilization
- clean up dirt and loose sediment at inlet at very bottom of access lane.