Aging Inspection | 6/23/2017 | 6/23/2017 | 6/23/2017 | | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. No other corrections. Active Jayo homes on Cadet
|
DOC - Permit Finaled | 6/23/2017 | 6/23/2017 | 6/23/2017 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 10/4/2016 | 10/13/2016 | 10/13/2016 | P | FAIL |
Andy J. Long
|
|
|
WIP on foundation. Concrete truck caused some trackout and then did washout on empty lot (developer owns lot).
Corrections: - sweep sidewalk and gutter - Clea up washout pile
|
Site Preparation | 10/3/2016 | 10/4/2016 | 10/4/2016 | A | PASS |
Andy J. Long
|
|
|
Permit sign posted. DI bag installed on receiving storm drain. Active work in Trailwinds sub in compliance. Approved.
|