General Inspection | 4/17/2017 | 4/17/2017 | 4/17/2017 | P | PASS |
Andy J. Long
|
|
|
Townhome complete, landscaped, and stabilized. Units on east end of block are ongoing with no ESC violations observed, temporary BMPs okay to remain. ESC conditions satisfied.
|
DOC - Permit Finaled | 4/17/2017 | 4/17/2017 | 4/17/2017 | P | PASS |
Andy J. Long
|
|
|
|
Random Inspection | 3/23/2017 | 3/23/2017 | 3/23/2017 | P | PASS |
Melissa Jannusch
|
|
|
Vertical construction in progress. No ESC violations observed. No trackout.
|
Site Preparation | 10/27/2016 | 10/27/2016 | 10/27/2016 | P | PASS |
Andy J. Long
|
|
|
David Phone #: ###-####
BMPs installed; utilities and earthwork already completed under ESC15-00976 for main Idaho Street Townhomes project.
Approved for construction. 9 permits open, only 4 starting at this time..
|