Site Final | 4/25/2017 | 4/25/2017 | 4/25/2017 | P | PASS |
Melissa Jannusch
|
|
|
Demolition complete. SFH started. Okay to final.
|
Site Preparation | 4/24/2017 | 4/25/2017 | 4/25/2017 | A | PASS |
Melissa Jannusch
|
|
|
Sign is posted perimeter controls are in place. Ok to start. Left message with RP detailing ESC requirements. The excavator is tracking out onto sidewalk. Asked RP to ensure this will be swept at the end of each day. close this permit, check for BMPs for new SFH permit ESC17-00357. Request for early AM inspection.
|