Site Final | 6/28/2017 | 6/30/2017 | 6/30/2017 | P | PASS |
Melissa Jannusch
|
|
|
Project compelte. Okay to final.
|
Aging Inspection | 6/28/2017 | 6/28/2017 | 6/28/2017 | | CANC |
Andy J. Long
|
|
|
rescheduled for site final
|
Site Preparation | 10/3/2016 | 10/4/2016 | 10/4/2016 | P | PASS |
Andy J. Long
|
|
|
Edward Phone #: ###-####
Foundation repair backfill stockpile to be stored in vegetated back yard. Yellow permit sign posted in window on Ridenbaugh. Reviewed concrete washout containment rules and keeping perimter clean with GC Edward. Approved for construction.
|