Site Final | 7/20/2017 | 7/20/2017 | 7/20/2017 | P | PASS |
Melissa Jannusch
|
|
|
|
Aging Inspection | 7/20/2017 | 7/20/2017 | 7/20/2017 | | PASS |
Melissa Jannusch
|
|
|
Project complete. Soil is stable. Okay to final.
|
Site Preparation | 10/18/2016 | 10/18/2016 | 10/18/2016 | P | PASS |
Andy J. Long
|
|
|
Charlie-please call with a meet time Phone #: ###-####
Permit sign posted. Reviewed ESC condtions with builder. No MS4 system in area. Irrigation ditch has no water (shut off). Approved for construction.
|