Site Final | 11/1/2017 | 11/2/2017 | 11/2/2017 | P | PASS |
Andy J. Long
|
|
|
Project complete. ESC permit conditions satisifed. Temp. BMPs to remain installed @ RH #7 for ongoing construction.
|
Aging Inspection | 11/1/2017 | 11/1/2017 | 11/1/2017 | | CANC |
Andy J. Long
|
|
|
|
Aging Inspection | 9/1/2017 | 9/1/2017 | 9/5/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/8/2017 | 6/8/2017 | 6/8/2017 | P | PASS |
Melissa Jannusch
|
|
|
WIP on interior and exterior. Trash is contained and trackout is ok.
|
Site Preparation | 11/22/2016 | 11/23/2016 | 11/23/2016 | A | PASS |
Andy J. Long
|
|
|
Yellow card on site Inspection requested via web by Erby Gonzales
RH#7 subdivsion BMPs installed (inlet protection, concrete washout facility. Lot signs for permits installed. Approved for excavation.
|