Site Final | 5/9/2017 | 5/9/2017 | 5/9/2017 | P | PASS |
Andy J. Long
|
|
|
Demolition complete, ESC permit finaled. Parcel now part of Millwell Park subdivision phase 2, see ESC17-00426
|
General Inspection | 3/1/2017 | 3/6/2017 | 3/7/2017 | A | PEND |
Andy J. Long
|
|
|
milwell phase 2 - this is the ESC permit for the previous home demolitiion by same developer.
Trackout to Saxton has been cleaned.
Corrections still needed:
- submit SWPPP for review and get ESC permit issued for prep and irrigation pipe installation. - post CGP tracking # and info
|
General Inspection | 3/1/2017 | 3/1/2017 | 3/1/2017 | A | FAIL |
Andy J. Long
|
|
|
Need to clean up trackout from tree removal equipment. Install construction entrances and permit information
Wood River is developer, Wood Bros Ed Connel will be doing MIllwell #2 in this area. SWPPP is said to be ready for submittal for review. Two open ESC permits for previous demolition are issued, project needs to have active ESC permit before any grading or development work occurs.
Notified Ed Connel and Wood River of correction and status
|
General Inspection | 1/17/2017 | 2/2/2017 | 2/8/2017 | P | CANC |
Andy J. Long
|
|
|
check that no subdivision work has occurred;
check for trackout
|
Random Inspection | 1/17/2017 | 1/17/2017 | 1/17/2017 | P | PEND |
Andy J. Long
|
|
|
demolition complete. Permit holder allowed Wood Bros. to stockpile dirt temporarily.
Request to get ESC permits before Millwell Place #2 starts construction. Need CGP eNOI
|