Site Final | 5/9/2017 | 5/9/2017 | 5/9/2017 | P | PASS |
Andy J. Long
|
|
|
Demolition complete, ESC permit finaled. Parcel now part of Millwell Park subdivision phase 2, see ESC17-00426
|
Tracking Control | 4/19/2017 | 4/26/2017 | 5/1/2017 | A | PASS |
Melissa Jannusch
|
|
|
Sign is posted and trackout has been reduced. Sill some trackout.
|
Complaint Inspection | 4/19/2017 | 4/19/2017 | 4/19/2017 | P | FAIL |
Melissa Jannusch
|
|
|
Trackout down Saxton Ave. No sign is posted. Talked with RP on phone. Corrections requested clean up trackout. Used rocked entrance to enter and exit site. Post sign. Follow up scheduled for next week.
|
General Inspection | 3/30/2017 | 3/30/2017 | 3/31/2017 | P | PEND |
Andy J. Long
|
|
|
Some activity related to gravitiy irrigation installation for subdivision and irrigation district in their ROW. No trackout.
Wood Brothers to provide ESC permit application and SWPPP within first half of April
|