Site Final | 5/18/2017 | 5/18/2017 | 5/18/2017 | P | PASS |
Andy J. Long
|
|
|
Project complete, disturbed area stabilized/landscaped, no loose dirt or construction materials around site.
|
General Inspection | 4/21/2017 | 4/21/2017 | 4/21/2017 | P | PASS |
Melissa Jannusch
|
|
|
Almost complete no landscaping
|
Site Preparation | 12/13/2016 | 12/14/2016 | 12/15/2016 | A | PEND |
Andy J. Long
|
|
|
Approved for construction.
Correction needed:
- need to install sediment control on west side of parcel to protect swale and surface drainage pipe. This can be in conjunction with the developers plan to stabilize and protect area
|
Site Preparation | 12/13/2016 | 12/13/2016 | 12/13/2016 | P | CANC |
Andy J. Long
|
|
|
Luke Phone #: ###-####
|