Aging Inspection | 7/16/2018 | 7/16/2018 | 7/16/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 7/16/2018 | 7/16/2018 | 7/16/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 5/14/2018 | 5/14/2018 | 5/14/2018 | | PASS |
Andy J. Long
|
|
|
|
Site Final | 3/12/2018 | 3/13/2018 | 3/13/2018 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 3/12/2018 | 3/12/2018 | 3/12/2018 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 1/8/2018 | 1/8/2018 | 1/8/2018 | | PASS |
Andy J. Long
|
|
|
Project complete, BLD finaled and the clinic is occupied. Site currently covered under snow. Will follow up in February to make sure no materials from project have been left on adjacent lots.
All storm drains within Emerald Station next to SAMG Clinic and Cascadia still have temporary sediment protection installed.
|
General Inspection | 11/6/2017 | 11/6/2017 | 11/6/2017 | A | PASS |
Andy J. Long
|
|
|
Buidling complete, parking lot and landscaping installed. Staging area still in use and may require additional stabilization. No violations observed. DI protection installed for both active project in Emerald Station medical complex.
|
General Inspection | 10/3/2017 | 10/3/2017 | 10/3/2017 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 7/18/2017 | 8/2/2017 | 8/2/2017 | P | PASS |
Andy J. Long
|
|
|
Vertical construction and interior work occuring. Perimeter is clean and silt fence installed with wire fence. MS4 on Emerald has inlet protection. No dust, windblown trash, or trackout observed at time of inspection.
|
General Inspection | 7/18/2017 | 7/18/2017 | 7/18/2017 | P | PASS |
Andy J. Long
|
|
|
BMPs installed (construction entrance, perimeter silt fence). No trackout, fugitive dust, or discharges. Approved.
|
General Inspection | 4/3/2017 | 4/17/2017 | 4/17/2017 | P | PASS |
Melissa Jannusch
|
|
|
WIP on foundations. Minor trackout on sidewalks. DI protection ok. Perimeter controls ok. No corrections
|
General Inspection | 4/3/2017 | 4/3/2017 | 4/3/2017 | A | PASS |
Andy J. Long
|
|
|
WIP on foundation. Perimeter silt fence installed. Some minor trackout within medical park lanes, all storm drains have sediment proteciton. No trackout or discharges offsite. No correction requests at this time.
|