Site Final | 9/28/2017 | 9/28/2017 | 9/28/2017 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped and occupied. No temp BMPs, loose dirt or other materials left on site. ESC permit conditions satisfied.
|
General Inspection | 9/20/2017 | 9/20/2017 | 9/22/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 9/1/2017 | 9/1/2017 | 9/5/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/17/2017 | 8/17/2017 | 8/18/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/2/2017 | 6/2/2017 | 6/2/2017 | A | PASS |
Andy J. Long
|
|
|
Framing in progress. Trash and materials contained. No sediment runoff or trackout issues. Approved.
|
Tracking Control | 5/19/2017 | 5/23/2017 | 5/23/2017 | A | PASS |
Melissa Jannusch
|
|
|
Trackout ok.
|
Tracking Control | 5/17/2017 | 5/19/2017 | 5/19/2017 | A | FAIL |
Melissa Jannusch
|
|
|
Trackout not cleaned. No concrete washout installed.
|
General Inspection | 5/17/2017 | 5/17/2017 | 5/17/2017 | P | FAIL |
Melissa Jannusch
|
|
|
Concrete washout pour onto ground on inactive lot on echo ct. Trackout on Echo ct. Follow up scheduled.
|
Site Preparation | 2/10/2017 | 2/10/2017 | 2/10/2017 | P | PASS |
Melissa Jannusch
|
|
|
Talked with RP. Suggested adding construction entrance. Suggested having a street sweeper on a schedule to prevent track out. Natural vegetation in back of site should prevent muddy run off from site, but there are some wattles on site in case they are needed. Subdivision BMPs are in. Talked with RP about frequently checking DI bags because of clogging due to safety sand. Portta-potty will be delivered Monday. Sign is posted. Okay to start. Next inspection: Check to make sure concrete washout is installed and in use.
|