Aging Inspection | 12/7/2017 | 12/7/2017 | 12/7/2017 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 12/7/2017 | 12/7/2017 | 12/7/2017 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 4/28/2017 | 4/28/2017 | 4/28/2017 | P | PASS |
Melissa Jannusch
|
|
|
WIP. No trackout DIs ok.
|
BMP Violation | 3/10/2017 | 3/13/2017 | 3/14/2017 | P | PART |
Melissa Jannusch
|
|
|
DI protection is installed. WIP. Trackout is occurring. Continue to monitor trackout. Project okay.
|
General Inspection | 3/7/2017 | 3/8/2017 | 3/10/2017 | A | FAIL |
Melissa Jannusch
|
|
|
3304 S Cadet Ave: Work has been started. Concrete slurry on dirt. No inlet protection in the drop inlet, but there are two sand bags in the gutter. The sand bags are not providing adequate filtering. Corrections requested: Install inlet protection, concrete washout before more concrete work occurs. Left message with RP requesting changes. Follow up next week
|
Site Preparation | 3/3/2017 | 3/6/2017 | 3/7/2017 | P | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 3/3/2017 | 3/3/2017 | 3/3/2017 | P | FAIL |
Andy J. Long
|
|
|
Cameron Phone #: ###-####
Need to install sediment protection on storm drain on Cadet north of site. Permit sign posted.
Verbal Correction Request to Cameron via voicemail. No work started yet. Rescheduled.
|