Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberESC16-01662
StatusFinaled
Name KELLY PERRYMAN
Site Address 12593 W IRVING ST
Project NameThe Cottages at White Clouds
Customer Number 
ePlanReviewNo
Description
PLan P-2, s-story single family residence in a 10-unit attached/detached housing cluster. Type-VB non sprinkled construction.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Finaled7/11/20187/11/20187/11/2018PPASS
DetailsAndy J. Long
Please refer to ESC16-01675 & ESC16-01027 (main site permit) for remaing ESC site inspections at the Cottages at Whitecloud.
General Inspection5/24/20186/7/20186/7/2018PPASS
DetailsAndy J. Long
Trash is picked up around site, no significant trackout, no spills or discharges observed. Permit sign posted and RP on site. No new corrections at this time, approved.
BMP Violation5/18/20185/23/20185/24/2018APASS
DetailsAndy J. Long
Most correction requests from prior inspection have been completed:
- sidewalks and gutters have been swept
- loose trash around the "cottages" and in the staging area to the west of job trailer has been mostly picked up.
- DI bag where paint washout was conducted was cleaned up and bag changed out.
- Washout area by job trailer has been swept and dried material removved from sidewalk and gutter.


Corrections for next inspection in 2 week 6/7:
- install construction entrance to staging area to prevent trackout.
- clean up loose trash on HIghwood at east end of site
- figure out wallboard and paint washout system

No discharges, DI bags in good condition, RP on duty. Housekeeping needs to continue every day, but site is in improved condition.
Aging Inspection5/18/20185/18/20185/18/2018 FAIL
DetailsAndy J. Long
Permits posted, DI bags installed, no major trackout, RP on duty. Site is not compliance

Corrections needed:

- sweep all sidewalks and gutters
- pick up all loose trash around the "cottages" and in the staging area to the west of job trailer. Have full bins emptied. Add new bins along Mt. Hood.
- clean up inlet and DI bag where paint washout was conducted. Install designated washout areas for washout.
- clean up former washout area. Sweep all dried material off sidewalk and gutter.
- install construction entrance to staging area to prevent trackout.

Verbal correction to RP. Follow up compliance inspection scheduled for Wednesday 5/23
Site Preparation8/15/20178/15/20178/15/2017PPASS
DetailsMike Jordan