DOC - Permit Finaled | 7/11/2018 | 7/11/2018 | 7/11/2018 | P | PASS |
Andy J. Long
|
|
|
Please refer to ESC16-01675 & ESC16-01027 (main site permit) for remaing ESC site inspections at the Cottages at Whitecloud.
|
Aging Inspection | 5/23/2018 | 5/23/2018 | 5/24/2018 | | PASS |
Andy J. Long
|
|
|
Most correction requests from prior inspection have been completed: - sidewalks and gutters have been swept - loose trash around the "cottages" and in the staging area to the west of job trailer has been mostly picked up. - DI bag where paint washout was conducted was cleaned up and bag changed out. - Washout area by job trailer has been swept and dried material removved from sidewalk and gutter.
Corrections for next inspection in 2 week 6/7: - install construction entrance to staging area to prevent trackout. - clean up loose trash on HIghwood at east end of site - figure out wallboard and paint washout system
No discharges, DI bags in good condition, RP on duty. Housekeeping needs to continue every day, but site is in improved condition.
|