DOC - Permit Finaled | 10/30/2017 | 10/30/2017 | 10/30/2017 | P | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. BLD finaled.
|
General Inspection | 3/3/2017 | 3/7/2017 | 3/7/2017 | A | PASS |
Andy J. Long
|
|
|
follow up on Millwell Park corrections
Permit sign posted. Street and gutter clean. Foundation installed. No new corrections.
|
Tracking Control | 3/1/2017 | 3/1/2017 | 3/3/2017 | P | PEND |
Andy J. Long
|
|
|
checking with developer and subdivision permit holder on getting regular sweeping schedule set up
|
Site Preparation | 2/13/2017 | 2/14/2017 | 2/14/2017 | A | PASS |
Melissa Jannusch
|
|
|
Okay to start. Dropped of yellow sign. Talked with Nancy about plan to use neighborhood concrete washout.
|