Site Final | 3/7/2018 | 3/28/2018 | 3/30/2018 | A | PASS |
Andy J. Long
|
|
|
Temporary sediment bag in receiving storm drain removed. ESC permit conditions satisfied.
|
Aging Inspection | 3/7/2018 | 3/7/2018 | 3/7/2018 | | PEND |
Andy J. Long
|
|
|
Home complete and landscaped, just need to remove DI bags installed on Poplar. Notified RP-GC to remove. Site final scheduled for later this month
|
Aging Inspection | 1/4/2018 | 1/4/2018 | 1/4/2018 | | PASS |
Michael Zawacki
|
|
|
Work about complete. Some interior and garage work remaining.
|
Site Preparation | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | PASS |
Andy J. Long
|
|
|
Permit signs posted at site. Concrete washout bin provided onsite. RP-GC on site for inspection. Storm drain inlet to the east on Poplar will have filter mat installed. Driveways will be installed on alley, no new curb cutting
|