Aging Inspection | 3/7/2018 | 3/7/2018 | 3/7/2018 | | PASS |
Andy J. Long
|
|
|
Home complete and landscaped. ESC permit conditions satisfied. 3 projects in a row by Hill Construction. 1 permit remains open for DI bag removal east of sites on Poplar.
|
DOC - Permit Finaled | 3/7/2018 | 3/7/2018 | 3/7/2018 | P | PASS |
Andy J. Long
|
|
|
|
Aging Inspection | 1/4/2018 | 1/4/2018 | 1/4/2018 | | PASS |
Michael Zawacki
|
|
|
Work about complete. Some interior and garage work remaining.
|
General Inspection | 4/19/2017 | 4/28/2017 | 4/28/2017 | P | PASS |
Andy J. Long
|
|
|
WIP. No trackout, spills, or discharges observed. MS4 had filter bag installed as requested. No corrections.
|
General Inspection | 4/19/2017 | 4/19/2017 | 4/19/2017 | P | PASS |
Melissa Jannusch
|
|
|
Concrete washout installed. DI bag installed and ok.
|
General Inspection | 4/4/2017 | 4/17/2017 | 4/19/2017 | P | CANC |
Melissa Jannusch
|
|
|
check for inlet protection and get picture of washout container
|
Site Preparation | 4/4/2017 | 4/4/2017 | 4/4/2017 | P | PASS |
Andy J. Long
|
|
|
Dean Phone #: ###-####
Permit signs posted at site. Concrete washout bin provided onsite. RP-GC on site for inspection. Storm drain inlet to the east on Poplar will have filter mat installed. Driveways will be installed on alley, no new curb cutting
Will check back for inlet protection next inspection
|