General Inspection | 6/29/2018 | 6/29/2018 | 6/29/2018 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 6/29/2018 | 6/29/2018 | 6/29/2018 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 5/14/2018 | 5/14/2018 | 5/14/2018 | P | PASS |
Michael Zawacki
|
|
|
Site is contained, no dirt on public side of fence.
|
General Inspection | 3/30/2018 | 3/30/2018 | 3/30/2018 | P | PASS |
Michael Zawacki
|
|
|
No dirt leaving perimeter. Area is fenced off and all contained. DIs are protected and clean.
|
General Inspection | 2/19/2018 | 2/19/2018 | 2/21/2018 | | PASS |
Michael Zawacki
|
|
|
All work contained, no esc issues.
|
General Inspection | 1/2/2018 | 1/2/2018 | 1/2/2018 | | PASS |
Michael Zawacki
|
|
|
All work and disturbance contained within perimeter. No dirt leaving site. Work area is clean, work is all interior and exterior. No ground disturbing activities.
|
General Inspection | 11/14/2017 | 11/14/2017 | 11/14/2017 | | PASS |
Michael Zawacki
|
|
|
Vertical construction in progress. DIs around site clean, no trackout. Trash is being cleaned and put into dumpster. Clean sitw without any issues.
|
General Inspection | 9/29/2017 | 9/29/2017 | 10/2/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/28/2017 | 7/31/2017 | 8/2/2017 | A | PASS |
Andy J. Long
|
|
|
Dried slurry in gutter has been swept. BMPs installed. Vertical construciton in progress, no fugitive dust or trackout issues. Approved.
|
General Inspection | 7/24/2017 | 7/27/2017 | 7/28/2017 | A | CANC |
Andy J. Long
|
|
|
|
General Inspection | 7/24/2017 | 7/24/2017 | 7/24/2017 | A | PART |
Andy J. Long
|
|
|
Need to clean up dried concrete slurry that was uncontained or spill and ran into gutter on Oakland Material is now dry.
No other violations. Site BMPs (concrete washout pan, DI protection, stabilized access, and trash containment) are installed.
|
General Inspection | 5/15/2017 | 5/15/2017 | 5/15/2017 | A | PASS |
Melissa Jannusch
|
|
|
DIs okay. Trash contained. No trackout. Entrance is fairly clean. Concrete washouts in use. No corrections.
|
Site Preparation | 3/14/2017 | 3/15/2017 | 3/15/2017 | A | PASS |
Melissa Jannusch
|
|
|
Met with Evan onsite. Reviewed plan and inspected site BMPs. Plan to use paved section of project as construction entrance and implement daily sweeping. DI bags are installed. Concrete washout will be installed when concrete work begins. Project okay.
|