General Inspection | 12/8/2017 | 12/8/2017 | 12/8/2017 | | CANC |
Michael Zawacki
|
|
|
|
DOC - Permit Finaled | 12/8/2017 | 12/8/2017 | 12/8/2017 | P | PASS |
Michael Zawacki
|
|
|
|
General Inspection | 11/23/2017 | 11/23/2017 | 11/24/2017 | | CANC |
Andy J. Long
|
|
|
|
General Inspection | 11/8/2017 | 11/8/2017 | 11/9/2017 | | PASS |
Michael Zawacki
|
|
|
Exterior of home finished. In process of landscaping.
|
General Inspection | 10/24/2017 | 10/24/2017 | 10/26/2017 | | CANC |
Andy J. Long
|
|
|
|
Site Preparation | 3/27/2017 | 3/31/2017 | 4/5/2017 | P | PART |
Andy J. Long
|
|
|
New washout pit provided, though now full of stormwater. Should be drained before use and location relocated to area that does not receive storm water run on. WIP on cleaning up sediment trapped outside of DI protection on corner.
|
Site Preparation | 3/24/2017 | 3/27/2017 | 3/27/2017 | A | PEND |
Melissa Jannusch
|
|
|
Sign is posted. Perimeter controls are installed. DI bags are installed. Corrections requested: 1.Clean sediment around DIs on Goshawk and arrow villa 2.Maintenance to concrete washout and refresh rocked entrance 3.Implement daily sweeping to site while muddy conditions persist. Spoke with RP about corrections requested. Developer maintains the washout and DI protection will request corrections to developer as well. Left a message for developer RP (Jill Jenkins) requesting corrections to the DI bags and the concrete washout.
|