Information based on query as of Sunday, June 23, 2024.
Permit Information
Permit NumberESC17-00107
StatusFinaled
Name EDWARD CONNELL
Site Address 4022 N GOSHAWK PL
Project Name2-5 Eyrie Canyon
Customer Number 
ePlanReviewNo
Description
Build a single family home. BMPs: concrete washout, construction access (W side of lot), straw wattles are located around the north west perimeter of the site. Stock piles of dirt are located in the NW corner of the lot. The area to the East in the back of the lot is to remain undisturbed. During site prep ensure subdivision BMPs are installed and erosion problems are controlled before construction can begin.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
General Inspection12/8/201712/8/201712/8/2017 CANC
DetailsMichael Zawacki
DOC - Permit Finaled12/8/201712/8/201712/8/2017PPASS
DetailsMichael Zawacki
General Inspection11/23/201711/23/201711/24/2017 CANC
DetailsAndy J. Long
General Inspection11/8/201711/8/201711/9/2017 PASS
DetailsMichael Zawacki
Exterior of home finished. In process of landscaping.
General Inspection10/24/201710/24/201710/26/2017 CANC
DetailsAndy J. Long
Site Preparation3/27/20173/31/20174/5/2017PPART
DetailsAndy J. Long
New washout pit provided, though now full of stormwater. Should be drained before use and location relocated to area that does not receive storm water run on. WIP on cleaning up sediment trapped outside of DI protection on corner.
Site Preparation3/24/20173/27/20173/27/2017APEND
DetailsMelissa Jannusch
Sign is posted. Perimeter controls are installed. DI bags are installed.
Corrections requested:
1.Clean sediment around DIs on Goshawk and arrow villa
2.Maintenance to concrete washout and refresh rocked entrance
3.Implement daily sweeping to site while muddy conditions persist.
Spoke with RP about corrections requested. Developer maintains the washout and DI protection will request corrections to developer as well. Left a message for developer RP (Jill Jenkins) requesting corrections to the DI bags and the concrete washout.