Aging Inspection | 1/11/2018 | 1/11/2018 | 1/11/2018 | | PASS |
Andy J. Long
|
|
|
project complete, all permits finaled. No ESC requests.
|
DOC - Permit Finaled | 1/11/2018 | 1/11/2018 | 1/11/2018 | P | PASS |
Andy J. Long
|
|
|
|
Site Preparation | 3/28/2017 | 3/29/2017 | 3/29/2017 | A | PASS |
Melissa Jannusch
|
|
|
Sign is posted. Minimal BMPs. Flat lot. Talked with RP about trackout, keeping dirt out of the street, using concrete washout and containing trash. ok to start.
|