DOC - Permit Finaled | 1/18/2018 | 1/18/2018 | 1/18/2018 | P | PASS |
Andy J. Long
|
|
|
ESC inspections conducted on all sites are entered under main site permit Tablerock Subdivision, see ESC16-00945. This permit will remain open till permit conditions are met.
Units 2349 Warm Springs to 2393 have been finaled.
|
General Inspection | 1/15/2018 | 1/15/2018 | 1/16/2018 | | PASS |
Andy J. Long
|
|
|
|
General Inspection | 12/28/2017 | 12/28/2017 | 12/28/2017 | | PASS |
Michael Zawacki
|
|
|
WIP on vertical and interiors. Site frozen, no issues.
|
General Inspection | 12/11/2017 | 12/11/2017 | 12/11/2017 | | PASS |
Michael Zawacki
|
|
|
Some dirt on sidewalk in front. Excavation ion rear, all contained by retaining wall. Entire area is currently frozen at time of inspection.
|
General Inspection | 11/17/2017 | 11/17/2017 | 11/17/2017 | | CANC |
Andy J. Long
|
|
|
|