General Inspection | 1/17/2018 | 1/17/2018 | 1/18/2018 | | PASS |
Andy J. Long
|
|
|
|
DOC - Permit Finaled | 1/18/2018 | 1/18/2018 | 1/18/2018 | P | PASS |
Andy J. Long
|
|
|
ESC inspections conducted on all sites are entered under main site permit Tablerock Subdivision, see ESC16-00945. This permit will remain open till permit conditions are met.
Units 2349 Warm Springs to 2393 have been finaled.
|
General Inspection | 1/2/2018 | 1/2/2018 | 1/2/2018 | | PASS |
Michael Zawacki
|
|
|
WIP on framing, interiors, and exteriors. No issues observed.
|
General Inspection | 12/13/2017 | 12/13/2017 | 12/13/2017 | | PASS |
Michael Zawacki
|
|
|
Site frozen. Dirtywork in back contained on site by retaining wall/curbing. No concrete work occuring.
|
General Inspection | 11/24/2017 | 11/24/2017 | 11/24/2017 | | PASS |
Andy J. Long
|
|
|
|