General Inspection | 1/18/2018 | 1/18/2018 | 1/18/2018 | | PASS |
Andy J. Long
|
|
|
Home complete, stabilized, and landscaping installed. No debris or materials left around site DI bags to remain installed down hill for active construciton on Mockbee
ESC permit conditions satisfied.
|
DOC - Permit Finaled | 1/18/2018 | 1/18/2018 | 1/18/2018 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 1/3/2018 | 1/3/2018 | 1/4/2018 | | PASS |
Michael Zawacki
|
|
|
Home complete. Need to wait until spring to check for final stabalization.
|
General Inspection | 12/13/2017 | 12/13/2017 | 12/13/2017 | | PASS |
Michael Zawacki
|
|
|
House occupied. Landscaping still not complete.
|
Site Preparation | 4/4/2017 | 4/5/2017 | 4/5/2017 | A | PASS |
Melissa Jannusch
|
|
|
BMPs in place. Sign posted. Sub recently swept. Talked with RP about concrete washout plans. Okay to start.
Bryan Phone #: ###-####
|