Site Final | 1/11/2018 | 2/1/2018 | 1/31/2018 | A | CANC |
Andy J. Long
|
|
|
already finaled
|
DOC - Permit Finaled | 1/31/2018 | 1/31/2018 | 1/31/2018 | P | PASS |
Andy J. Long
|
|
|
ESC conditions satisfied.
|
Site Final | 1/16/2018 | 1/16/2018 | 1/18/2018 | P | PASS |
Michael Zawacki
|
|
|
|
Site Final | 1/11/2018 | 1/11/2018 | 1/16/2018 | P | CANC |
Andy J. Long
|
|
|
|
Site Final | 1/11/2018 | 1/11/2018 | 1/11/2018 | P | NR |
Andy J. Long
|
|
|
Construction compete, site is paved and landscaped and has onsite stormwater retention. No loose materials or construction debris remaining. BLD permit has been finaled.
Correction request for RP left by phone: - remove temporary DI bag from MS4 drain on Victory and call back for site final.
|
General Inspection | 11/27/2017 | 11/27/2017 | 11/27/2017 | P | PASS |
Michael Zawacki
|
|
|
External building work and parking lot complete. Cutting Edge is installing irragation system. No loosed dirt. Only exposed areas are within planter boxes.
|
General Inspection | 6/27/2017 | 6/28/2017 | 6/28/2017 | A | PASS |
Andy J. Long
|
|
|
WIP on foundations. ESC site plan and permit on site for review. RP on duty.
Water truck available for dust control. No issues or complaints received.
Onsite storm drain at northwest corner is protected and will be replaced this weekend with new large facility. MS4 on Victory has DI bag installed.
Approved.
|
General Inspection | 6/21/2017 | 6/23/2017 | 6/27/2017 | A | CANC |
Andy J. Long
|
|
|
|