General Inspection | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | DONE |
Andy J. Long
|
|
|
Project now covered under ESC17-01545 with new operator ESI
|
DOC - Permit Finaled | 11/29/2017 | 11/29/2017 | 11/29/2017 | P | PASS |
Andy J. Long
|
|
|
|
General Inspection | 11/14/2017 | 11/14/2017 | 11/14/2017 | A | PEND |
Michael Zawacki
|
|
|
During inspection notify contractor ESI that they need to get their own ESC permit. Former permit was held by Petra who did the grading.
Permit has been created and attached to BLD, see ESC17-01545. They need to designate an RP.
ESI knows that they need their own permit. Said NOI has been filed and SWPPP being brought in for review.
|
General Inspection | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | FAIL |
Andy J. Long
|
|
|
New contractor does not have an ESC permit with City, site did not notify permit transfer fee. This permit to be closed and new ESC permit ESC17-01545 needs to be issued with BLD17-01763
|
General Inspection | 9/29/2017 | 10/2/2017 | 10/5/2017 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 8/2/2017 | 8/2/2017 | 8/2/2017 | P | PASS |
Andy J. Long
|
|
|
WIP on foundation excavation and removal of unsuitable/contanimated soils to designated dump sites.
Water truck onsite for fugitive dust control, construction entrance installed, surrounding storm drains (MS4 & onsite) have sediment filters installed. Site also inspected by 3rd Party SWPPP inspector from Terracon, who was onsite inspecting with RPR Ron.
|
General Inspection | 7/13/2017 | 7/13/2017 | 7/13/2017 | A | PASS |
Andy J. Long
|
|
|
Demolition and excavation of site is in progress. Water trucks on site for dust control. No trackout or fugitive dust.
Stockpiles are covered in plastic sheeting, perimeter wattle installed, and surrounding storm drains have inlet protection. Approved.
|
General Inspection | 6/22/2017 | 6/29/2017 | 6/30/2017 | P | PASS |
Melissa Jannusch
|
|
|
Excavation underway. No trackout, dust is controlled, no trash onsite. No corrections.
|
Site Preparation | 6/22/2017 | 6/22/2017 | 6/22/2017 | P | PASS |
Andy J. Long
|
|
|
Ron Phone #: ###-####
Initial BMPs for soil removal and demolition of west end of Broadway Albertson's are installed. All surrounding storm drains on Beacon, Grant and Rossi have sediment filter protection.
Water truck will be onsite for dust suppression tomorrow.
Permit sign and SWPPP site map are located on Beacon Street. RP/GC Ron was onsite for site inspection & conference.
Approved for construction.
|