Information based on query as of Wednesday, July 3, 2024.
Permit Information
Permit NumberESC17-00414
StatusFinaled
Name COLBY CURTISS
Site Address 2711 N COOLWATER AVE
Project Name28-1 Dropzone
Customer Number 
ePlanReviewNo
Description
As per ESC Conditions
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Site Final9/12/20179/12/20179/12/2017PPASS
DetailsJim Sly
DOC - Permit Finaled9/12/20179/12/20179/12/2017PPASS
DetailsJim Sly
BMP Violation7/19/20177/25/20177/28/2017APART
DetailsAndy J. Long
DI bag was cleaned and re-installed.

No new concrete washout provided yet. No new foundations or grading currently.
General Inspection7/19/20177/19/20177/19/2017AFAIL
DetailsAndy J. Long
No DI bag replacement. Rest of Dropzone and CBH projects in compliance.

CBH RP Colby on site. Issued verbal correction. He said he would do it, as well as provide new lined washout for next round of foundations.
BMP Violation7/3/20177/10/20177/13/2017PCANC
DetailsAndy J. Long
change out DI bag
BMP Violation6/27/20177/3/20177/3/2017AFAIL
DetailsAndy J. Long
Corrections not fully completed.

1. Need to provide new concrete washout and clean up old washout.
2. Change out DI bag on Coolwater.


Abram and Coolwater were swept.
Random Inspection6/27/20176/27/20176/27/2017PFAIL
DetailsAndy J. Long
Correction requests issued to CBH homes RP Colby and Tracy:

1. Sweep Coolwater and Abram Streets
2. Replace full concrete washout. No new Site prep approvals until new lined washout provided.
3. Check and maintain DI bags on Coolwater and Abram. Need to clean up mud in gutter on Coolwater immediately and empty/re-install sediment bag