Site Final | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | PASS |
Andy J. Long
|
|
|
Construction complete, no loose construction materials or dirt & debris. Adajacent lot owned by North Pointe and retains stormwater. No temp BMP removal required. No corrections, all permits finaled.
|
General Inspection | 10/19/2017 | 10/19/2017 | 10/19/2017 | P | PASS |
Michael Zawacki
|
|
|
SIte and dirt work complete.
|