Site Final | 8/24/2017 | 8/24/2017 | 8/24/2017 | P | PASS |
Jim Sly
|
|
|
|
DOC - Permit Finaled | 8/24/2017 | 8/24/2017 | 8/24/2017 | P | PASS |
Jim Sly
|
|
|
|
General Inspection | 6/27/2017 | 7/14/2017 | 7/14/2017 | A | PART |
Melissa Jannusch
|
|
|
Remove DI bag on N side of Jeremy. Maintenance DI bag on South side. Sweep up area. Issued corrections to RP Kelley.
|
General Inspection | 6/21/2017 | 6/22/2017 | 6/27/2017 | P | CANC |
Andy J. Long
|
|
|
|
General Inspection | 6/27/2017 | 6/27/2017 | 6/27/2017 | P | PASS |
Andy J. Long
|
|
|
Trackout clumps cleaned on DeWitt street, no parking is occuring on adjacent open lot as requested.. DI bags installed west of site at Linda Vista.
Next inspection will need to change out DI bags . Also before next set of homes. Two open lots remain.
|
Tracking Control | 6/20/2017 | 6/20/2017 | 6/21/2017 | P | PEND |
Andy J. Long
|
|
|
RP stated trackout has been cleaned or dissipated since this morning. Will check on site on site conditions at end of week.
|
Site Preparation | 5/9/2017 | 5/10/2017 | 5/10/2017 | A | PASS |
Melissa Jannusch
|
|
|
Okay to start. Sign is posted. Trackout on the corner of Linda vista and Jeremy. Talked with RP and requested correction.
Kelly Phone #: ###-####
|