Site Final | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | PASS |
Andy J. Long
|
|
|
Home complete, landscaped, and occupied. Active construction ongoing in RH#7, temp BMPs to remain installed till full completion
|
General Inspection | 7/13/2017 | 7/20/2017 | 7/20/2017 | A | PASS |
Melissa Jannusch
|
|
|
Trash has been maintenanced. Most bins are half full or less. Some wattles netting is still present at the entrance of subdivision. Please remove.
|
General Inspection | 7/13/2017 | 7/13/2017 | 7/13/2017 | P | FAIL |
Andy J. Long
|
|
|
Trash container is over full. Wind blown trash and debris blown around multiple sites in RH#7. Request issued to empty containers and have crew do a litter pick up in the common areas and site perimeter.
|
Site Preparation | 6/16/2017 | 6/16/2017 | 6/16/2017 | P | PASS |
Melissa Jannusch
|
|
|
Phone #: ###-#### Inspection requested via web by Braxton Hansen
|